Insights / Specification

Fifteen years in the ADNOC and Aramco specs. Somebody still had to sell it.

Being specified is the biggest lever on a project. It is not the job. What I actually did to take Middle East sales up 167% in a year, what happened on 22 Bishopsgate, and five questions to ask before you walk away.

Scott Robinson, 16 November 2026, 4 min read

Hughes were written into the ADNOC and Aramco specifications fifteen years before I joined. In 2024 I took Middle East sales up 167% on the year before.

I did not do that by getting into a specification. They were already in it.

Being specified is the single biggest lever in project sales. It tilts the odds hard in your favour and I would always rather be in than out. But a specification is a position, not an order. I am not going to tell you a story about those fifteen years, because I was not there. I can tell you what I did.

What 167% actually took

I spent nine months out of twelve in the GCC that year. It was not a campaign. It was presence.

I removed the distributors that were no longer fit for purpose. The incumbent was a PPE distributor selling safety equipment, and that is a completely different sale. I spotted that the fire safety sector aligned far better and built a strong relationship there.

I got close to the EPC contractors in the region: Técnicas Reunidas, Samsung, Saipem, McDermott, Wood, CNPC, Tecnimont, Target Engineering.

Then I ran two prongs. Direct where we could, and bidding alongside the fire safety players where we could not. That mapped the market properly, and it opened up projects the business was never even getting to pitch for while it ran purely through distribution.

The reason matters. In a 2018 McKinsey survey of more than 100 senior US manufacturing executives, manufacturers aiming for more direct sales gave developing more end customer relationships as their top reason, at 40% of respondents. Capturing the distributors' margins came in at 14%. That is US manufacturers in 2018, so read it with that in mind, but it is the right order of priorities. The relationship with the end customer comes first.

Being written in gives you a position. Somebody still has to go and sell from it.

Specified is where the work starts

22 Bishopsgate is a huge London tower. I was at Brannan, and the decision to specify our gauges and thermometers came from WSP. Job done, you would think.

It was not. We then had to give Multiplex, the main contractor, the confidence to use us. Hotchkiss, the MEP contractor, had to go with Wolseley, our partner, who held the relationship. So I worked with every business in the chain, the developers, WSP, Multiplex, Hotchkiss and Wolseley, and made sure every one of them knew who Brannan was.

I closed it before I had to ask for the business. When I did ask, I already knew we had it, because several people upstream had told me they were using us. Around £150,000, landed around August 2019.

If you are outside it

It is not pass or fail. Thousands of projects are won by manufacturers who are on the approved vendor list and not written into the specification. It depends on the EPC, the operator, the budget and the commercial case.

Treat being outside the spec as the end of the job and you either walk away from winnable business or spend six months pushing at the wrong door.

On Marjan I booked a call with Aramco and mapped the timings from the owner's side. Nobody else did it, because everybody else was working the EPC. That is why both angles is part of the method. The contractor will tell you what the specification says. The owner can tell you what they actually want and when they actually want it.

Five questions before you walk away

  1. Are you on the approved vendor list, or could you be in the time available?
  2. Which EPC holds this, and how much room do they have?
  3. What does the operator actually care about on this job?
  4. Is there budget, and whose is it?
  5. What is the commercial case for changing, stated in terms somebody can defend in a meeting you will not be in?

Some of the time those answers tell you to leave it alone, and that is a good result if you get it in a fortnight rather than a year.

The short version

In the spec, go and sell from it. Out of it, find out before you walk. Either way, work every name in the chain.